  Make-Up Water System Modifications and Water Storage Tanks

 

Owner
Lexis Nexis

Mechanical Contractor
Batchelor and Kimball

Construction Cost
$300,000

 

Scope

Mechanical systems design and construction phase services for a new water storage system and modifications to the cooling tower make-up water system to enhance reliability.

 

Special Circumstances

  • Add two 20,000 gallon, vertical aboveground water tanks to hold standby make-up water.

  • Modify the existing water system to allow a domestic water to blend with well water stored in the new water storage tanks.

  • Provide new, redundant, make-up water pumps.

  • Modify existing control system to accommodate new water storage tanks and make-up water system.

  • Integrate new storage system with existing system, with minimum interruption of service.

  • Permit variable blending of domestic and well supplied water into the new storage system.

 