Shepherd Center Mechanical Upgrade

Mechanical renovation of existing building to upgrade the building’s HVAC system to sufficiently cool the building.

  • Critically phased construction process.
  • Renovation work was done during building occupancy.
  • Reconfigure existing air handler serving all four floors to serve first and second floor exclusively.
  • Addition of a new 40,000-CFM rooftop air handler with heat recovery to serve third and fourth floors.
  • New vertical air risers with terminals on each floor.
  • Add new rooftop chiller with conversion of chilled water system to a primary/ secondary type.