Georgia Institute of Technology Atlantic Drive Steam Line Replacement

3,100 linear feet of steam and city water distribution systems, including six new utility vaults connected to five existing buildings.

  • Design and construction services were conducted in 3 Phases over a 24-week period.
Scroll to Top
Verified by MonsterInsights