
Emory Clinic Vivarium Laboratory
Mechanical systems design and construction phase services for the renovation of the 14,000 sq. ft. Vivarium Laboratory.
Mechanical systems design and construction phase services for the renovation of the 14,000 sq. ft. Vivarium Laboratory.
Complete mechanical design and construction phase services for a new 56,000 square foot natatorium and gymnasium building with separate exercise
Complete mechanical design and construction phase services for a new 20,000 sq. ft. library within the Gwinnett County Public Library
An expansion of a 170,000 sq. ft., two-story data center and mechanical/electrical systems upgrade and expansion. The facility houses a
Provide mechanical systems design and construction phase services for a 120,000 sq. ft. multi-function, four-story addition to the existing hospital,
Mechanical design and construction phase services for 1,150 linear feet of underground chilled water distribution system consisting of 14, 12,
Mechanical expansion and upgrade for a 100% redundant, 5250 ton, 2N chilled water plant serving a 300,000 sq ft Data
New 50,000 sq ft facility Data Center and Office areas with fully redundant HVAC operational capability. Facility includes expansion area
Complete mechanical design for a $30-million, 110,000 sq. ft. Olympic sports training facility that is attached to the existing campus
Complete mechanical design and construction phase services for the 170,000 sq. ft. renovation of five lower tenant floors and the
Mechanical and plumbing renovation of a 30,000 sq. ft. two-story office building with 4,000 sq. ft. addition. The project has
Mechanical design and construction phase services for a 78,000 sq. ft. life sciences building. Program requirements include specialized science and
Mechanical design and construction phase services for complete interior demolition and renovation of a 28,900 sq. ft. classroom building originally
Mechanical design and construction phase services for renovation of a 133,800 sq. ft. high school plus a new 31,000 sq.
Mechanical design and construction phase services for the University Athletic Association and Football Operational Headquarters with a renovation of 56,000
Mechanical design and construction phase services for a new 50,000 sq. ft. three-story dining and classroom building. The building includes
Fuel storage and dispensing system design and engineering services for the gasoline storage systems installed in new CarMax automotive sales
Mechanical design and construction phase services for a new 16,000 sq. ft. four story classroom building addition plus an 8,500
Mechanical design and construction phase services for a new 104,000 sq. ft. recreation and wellness facility, which includes a natatorium
Mechanical systems design and construction phase services for a new 28,000 sq ft aquatic center complete with an 11-lane competition
JSA was the lead engineer for multi-year fuel system replacement/upgrade programs for two large telecommunication companies. The goals for both
Mechanical systems design and construction phase services for a new water storage system and modifications to the cooling tower make-up
Conversion of Holland Steam Plant from #6 heating oil to mixed propane standby system.
Mechanical design and construction phase services for a new 61,500 sq ft fitness and wellness facility, which includes a natatorium,
Mechanical design and construction phase services for a new 55,700 sq. ft. academic science building. Program requirements include specialized science
Mechanical design and construction phase services for the University of Georgia Athletic Association’s new West End Improvement project that includes
Provide mechanical systems design and construction phase services for a new, 30,000 sq. ft., two-story community health clinic. Multiple health
New 75,000 sq. ft. building, which contains a state-of-the-art Performing Arts Center and the Morehouse Music Education Building. 700-seat auditorium
JSA designed mechanical systems for a new 112,000 SF elementary school that includes 52 classrooms, Cafeteria and Kitchen facilities, Multi-Purpose
New 220,000 sq. ft. Young Women’s Academy for the City of Atlanta. Campus buildings include separate middle and high school
Mechanical and plumbing systems design and construction phase services for the renovation of a 1,000-bed student living facility.
Mechanical renovation of existing building to upgrade the building’s HVAC system to sufficiently cool the building.
Mechanical design and construction phase services for a new 70,000 square foot middle school. Project facility has achieved a Gold
Mechanical design and construction phase services for an HVAC renovation of a 170,000 sq ft high school plus a new
Complete mechanical design and construction phase services for a new, $10-million, 54,000 sq. ft. natatorium and gymnasium building with separate
Complete mechanical Tenant fit-up design and construction phase services for four floors of a seven-story office building at 31,000 sq.
Mechanical engineering design services for the demolition of the existing 159-bed residence hall and reconstruction of a new $21-million, 78,000
HVAC, plumbing, and fire protection systems for a new $28-million, 104,000 sq. ft., 344-bed residence hall. The project has achieved
$32-million renovation of a 200,000 sq. ft. high school building for Atlanta Public Schools. The 1,100-student school received extensive interior
Complete mechanical systems tenant fit-up to accommodate the American Cancer Society’s relocation and consolidation of their National Headquarters and its
Design the mechanical systems (HVAC, fire protection, and fuel storage) for a new 27,384 sq. ft. laboratory and support space.
New 30,000 gallon underground fuel storage tank and piping.
Developer desired a retail shopping complex with a high degree of sustainable design elements and has been awarded the LEED
Mechanical design and construction phase services for a new 123,000 square-foot facility, which includes 36 labs, 12 classrooms, 2 seminar
Fuel storage and dispensing systems design and construction services for a new retail “mini-mall” facility located on the Fort Stewart
Mechanical design and construction phase services for 183,000 sq. ft. mixed use complex comprised of a community theater, gymnasium, classrooms,
JSA, as prime consultant for Georgia Environmental Facilities Authority (GEFA), was tasked to bring the State’s underground fuel storage tank
Renovation of 6,000 sq. ft. existing and 17,000 sq. ft. expansion. Eighteen air-cooled computer room air conditioning units serve the
Mechanical systems design and construction phase services for a new $16-million, 46,000 sq. ft. aquatic center complete with an indoor
$39-million new construction of a 233,000 sq. ft. combined high and middle school building with adjacent cafeteria, gymnasium, and performing
Expansion of the existing infrastructure to add capacity and convert the data center from Tier II to near-Tier IV. The
Complete mechanical design and commissioning services for a new 8,000 square foot museum and visitor center building located at Sweetwater
New four-story 76,000 sq. ft. classroom building that includes a library, science labs, meeting rooms, offices, and student commons area.
Complete mechanical design and construction phase services for the University Athletic Association and football operational headquarters with a renovation of
Complete mechanical systems design and construction phase services for HVAC, plumbing, and fire protection systems to serve this new two-story
Mechanical design and construction phase services for a 275,000 sq. ft. mixed-use complex comprised of a seven-story building, a six-story